Drilling
After more than a week of hard work in difficult monsoon weather conditions, our Local Team and the drilling Company were able on Monday to reach the Nahom area where our construction site is located. During these 4 days, under heavy rains, the drilling was successfully completed to a depth of 72 meters. And the […]